School Asbestos Management Plan Forms and Resources
AHERA Compliance Begins with the Asbestos Management Plan
Some of the requirements include:
- Designation of a person (LEA Designee) to ensure proper implementation of AHERA requirements.
- Completion of an Asbestos Management Plan by an NC Accredited Management Planner on forms provided by the program.
- State approval of the Management Plan through the Health Hazards Control Unit (HHCU).
- Record of asbestos awareness training for all the maintenance and janitorial staff.
- The Annual Notification to be kept with the Management Plan.
Initial Management Forms
AHERA Management Plan Cover Sheet (PDF)
- School Buildings ACBM Check (PDF)
- Preventive Measures and Response Actions Scheduled (PDF)
- Response Actions Recommended (PDF)
- Determination of Sampling Locations (PDF)
- Bulk Sample Analysis (PDF)
- Resources Needed (PDF)
- Steps to Inform Others (PDF)
- Reinspection Plan (PDF)
- Description of Each Sample Area (PDF)
- Operations and Management Plan (PDF)
- Assessment of Materials (PDF)
- Periodic Surveillance Plan (PDF)
To extract .zip folder contents: Right-click on the folder after downloading, then select "Extract All" (Windows PC) or "Open With" > "Archive Utility" (Mac), and follow the prompts.
On This Page Jump Links
Off